Harrisburg Boulevard

Harrisburg Boulevard Sidewalks and Trees

GEEMD is constructing the new sidewalks and installing pavers, stone cast street names, and ramps you see along Harrisburg Boulevard. Working alongside Metro on the East End Corridor, the management district will also construct seven major intersections, the first at Lockwood at Harrisburg.

Watch this time-lapse video of Metro and HRT construction of the light rail and pavers at the Lockwood-Harrisburg intersection:

http://www.youtube.com/watch?v=ISDd1fTBCwg